The AGATA 2π mechanical holding structure, that can hold 90 AGATA Triple Cryostats, was designed and built at STFC Daresbury. The holding structure arrived to LNL 2021-10-12 and was installed in front the PRISMA spectrometer.
Date: Thursday, 21 October, 2021
Attachments:
agata_holding_structure_installed_at_lnl_2021.jpg,
short1low.mp4
